Corporate Directory
Corporate Directory
State Gas Limited
ASX:GAS
Head Office
Suite 4, Level 1,
40 Edward Street
BRISBANE QLD 4000
www.stategas.com
Mailing Address
PO Box 10348
Brisbane QLD 4000
AUSTRALIA
Directors
Richard Cottee (Executive Chairman)
Tony Bellas (Non-Executive Deputy Chairman)
Greg Baynton (Non-Executive Director)
Rob Towner (Non-Executive Director)
Company Secretary and Chief Financial Officer
Suzanne Yeates
Solicitors
Allens Linklaters
Level 26
480 Queen Street
BRISBANE QLD 4000
+ 61 7 3334 3000
www.allens.com.au
Auditor
BDO Audit Pty Ltd
12 Creek Street
BRISBANE QLD 4000
+ 61 7 3237 5999
www.bdo.com.au
Share Registry
Link Market Services Limited
Level 15, 324 Queen Street
BRISBANE QLD 4000
1300 554 474 (within Australia)
Broker
Morgans Corporate Limited
Level 29, Riverside Centre
123 Eagle Street
BRISBANE QLD 4000
+ 61 7 3334 4888
www.morgans.com.au
- CSG is provided to the HDNG Facility by a gathering system connected to the Company’s Rougemont 2/3 dual lateral exploration and appraisal well (“Rougemont 2/3”), located within the Rolleston West Project area (ATP 2062)
- Rougemont 2/3 produces high-energy content CSG with minimal impurities (methane >92%) which is dehydrated and compressed at the HDNG Pilot Plant
- VP technology sourced through State Gas’ partnership with Mine Energy Solutions, allows delivery of HDNG by truck, in a range of up to 300km from the plant
- State Gas has an initial offtake agreement in place to support an ongoing hybrid engine truck trial at a local coal mine in the Southern Bowen Basin (increasing to 300GJ/day, but with opportunity to scale)
- State Gas has created substantial IP in the course of engineering, designing and constructing the HDNG Pilot Plant and in conjunction with its partners, is now evaluating how this technology might be more broadly applied (including design and construction of future HDNG plants that meet customer’s specific fuel demand circumstances)
- HDNG Pilot Plant cost approximately $8 million (excluding research and development costs, civil works and gas gathering system)
- 1.5 year pay-back period at full plant operating capacity (1.7TJ/day)
- Engineering progressed on next iteration of plant design - reduce fabrication costs and improve portability
About Us
Company profile, strategy and future growth
Investors
Investor information, reports and announcements
Shareholder Communication
Important information for shareholders
Sustainability
Workplace health & safety, environment and community